Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Christian, J and Mir, S U (1987) Use of Integrated Microcomputer Package for Formwork Design. Journal of Construction Engineering and Management, 113(04), 603–10.

Haltenhoff, C E (1987) Construction Management Performance Under Dual Services Agreements. Journal of Construction Engineering and Management, 113(04), 640–7.

  • Type: Journal Article
  • Keywords: Construction management; Decision making; Contract management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1987)113:4(640)
  • Abstract:
    The standard documents of the American Institute of Architects and the Associated General Contractors of America for construction management projects imply processes and operational procedures that have become customary if not standard since publication in 1975. Adjustments must be made to accommodate the particular form and variation of construction management specifically required by the contract. However, construction management firms have a tendency to customize processes and procedures for their own convenience. This is especially true on projects where a firm is contractually assigned other service responsibilities such as design, contracting, or construction. When a CM process and its procedures exactly match the intent of the project delivery system, owners are positioned to gain from the use of the system. When convenience intervenes, the system cannot function effectively, and the owner may experience negative results. This paper argues that convenient customizing of the CM process and its procedures, especially customizing that mitigates the checks and balances specifically built into the construction management system and implied by established CM practice, represents a detrimental divergence from the fundamental reasons CM is. selected for use by owners on their projects.

Ioannou, P G (1987) Geologic Prediction Model for Tunneling. Journal of Construction Engineering and Management, 113(04), 569–90.

Key, J M (1987) Earthmoving and Heavy Equipment. Journal of Construction Engineering and Management, 113(04), 611–22.

Kraiem, Z M and Diekmann, J E (1987) Concurrent Delays in Construction Projects. Journal of Construction Engineering and Management, 113(04), 591–602.

McQuillen, J L and Hicks, R G (1987) Construction of Rubber‐Modified Asphalt Pavements. Journal of Construction Engineering and Management, 113(04), 537–53.

Popescu, C (1987) Construction Engineering Graduate Education Survey. Journal of Construction Engineering and Management, 113(04), 664–8.

Tatum, C B (1987) Process of Innovation in Construction Firm. Journal of Construction Engineering and Management, 113(04), 648–63.

Thomas, H R and Yiakoumis, I (1987) Factor Model of Construction Productivity. Journal of Construction Engineering and Management, 113(04), 623–39.

Touran, A and Asai, T (1987) Simulation of Tunneling Operations. Journal of Construction Engineering and Management, 113(04), 554–68.